Scheduling unit time arc shutdowns to maximize network flow over time: complexity results

Download (398.85 kB)
journal contribution
posted on 2025-05-10, 10:19 authored by Natashia Boland, Reena Kapoor, Simranjit Kaur, Thomas Kalinowski
We study the problem of scheduling maintenance on arcs of a capacitated network to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard. Here we identify a number of characteristics that are relevant for the complexity of instance classes. In particular, we discuss instances with restrictions on the set of arcs that have maintenance to be scheduled; series-parallel networks; capacities that are balanced, in the sense that the total capacity of arcs entering a (nonterminal) node equals the total capacity of arcs leaving the node; and identical capacities on all arcs.

Funding

ARC

History

Journal title

Networks

Volume

63

Issue

2

Pagination

196-202

Publisher

Wiley-Blackwell Publishing Ltd

Language

  • en, English

College/Research Centre

Faculty of Science and Information Technology

School

School of Mathematical and Physical Sciences

Rights statement

This is the peer reviewed version of above article, which has been published in final form at http://dx.doi.org/10.1002/net.21536. This article may be used for non-commercial purposes in accordance with Wiley Terms and Conditions for Use of Self-Archived Versions.

Usage metrics

    Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC